07. Lay-By Wharves

Most of the floating repairs are carried alongside our lay-by wharves, which are two in number on the eastern and western side of the dock. The yard offers a total of 340 meters repair and lay-by wharves. The piled jetties are capable of mooring vessels up to 200 meters L.O.A. with a maximum draft of 8 meters. All our mobile cranes can be used to lift items off the ships at both our jetties.